Workplan - an introduction

The Forinvitox project is structured into six work packages (WPs).

Three are devoted to retrieve the relevant information required:
the availability of inventions (WP1),
the present and presumably future needs of users (WP2) and
the ability of currently existing manufacturers (WP3) to meet the required demands.

This will be followed by an analysis of the outcome of these exercises with the aid of experts (WP4). The ultimate goal will be to set up a Forum where the interested parts can meet (WP5). A general management workpackage is also envisaged (WP6).